Local architecture
local
International architecture
international
Civilanka Architects

Architecture, engineering and project solutions, designed
with purpose and precision

Explore our services
Civilanka Construction Process
Architects & Engineers Collaborating
Engineering & Infrastructure

Architectural Design & Planning

Concept design, space planning, authority drawings, 3D visualization and construction documentation for residential, commercial and industrial projects.

Engineering & BIM Solutions

Structural, civil, stormwater, MEP, BIM modelling, quantity take-off and technical documentation prepared for accurate coordination and practical construction.

• OUR WORK

 

 

+Design & Visualization
Urban Planning
−

Professional architectural design, 3D modelling, visualization, landscape design and technical drawing documentation for residential, commercial, industrial and mixed-use projects.

View engineering services
+Engineering & Infrastructure
Exterior
−

Structural, civil, drainage, infrastructure and MEP design support prepared with practical engineering coordination for accurate construction and authority submission.

View engineering services
+Management & Costing
Residential
−

Cost estimation, quantity surveying, project coordination, feasibility studies, technical specifications and consultancy support for better project planning and control.

View engineering services
−Project Close-Out
Interior
−

Project completion support including final documentation, handover preparation, maintenance planning and aftercare assistance for a controlled project close-out process.

View engineering services

From concept to construction, we deliver coordinated architecture, engineering, BIM, costing and project support for practical, buildable developments

Architect portrait

Harsha

Draughtsman & 3D Visualizer

Main Contractor portrait

Dhiyan

Structural Engineer

Architect portrait

Teshan

Structural Engineer

Product Designer portrait

Janith

Facility Engineer

They did an amazing job on my civil and structural design project! His creativity and attention to detail truly impressed me. He was friendly, communicative, and delivered everything ahead of schedule. I can't wait to work with him again!

ANTONE AUSTIN

GDI

Produced very good, high quality Structural Engineering documentation & drawings. I've got more upcoming work and will be engaging Civilanka Team for this.

GREG NICHOLS

Apex BTI

Civilanka is really great professional, not focused only on his field of engineering, but he also knows very well consequences and circumstances of his job to the rest of project. Definitely I want work with him again.

PETR SYKORA

Mazanec Fenix

Hi. One of the best Engineering Team i have ever worked with. Their skills in his field is really awesome. I'll definitely work with again on any civil project.

ANDREW

Epic

Thank you for the outstanding structural design project. The rigorous load assessments, validated stress modeling, and meticulous technical documentation have resulted in a structurally robust and constructible final product. Highly recommended

MATT BEHMER

Behmer Group

Civilanka Team is very responsible, professional, and easy to work with. I am already planning on using him for my next project!

BRIAN SCHOELKOPF

BCS Sports LLC

It is nice to work with Civilanka. They are accommodating and responsive.

KENNY C

Swan Li

A very professional and high standard work done in analysis seismic and harmonic force analysis of a RCC bridge in Autodesk Robot software. Highly recommended. Also helped with stamping the drawings and documents.

WEBB WEHBE

Metro Trucks

Civilanka was great. Great work, great communication, on schedule. Worked great with my architecture team

RAY B

Westport Structures

They consistently delivers top-quality work, demonstrating exceptional responsiveness and a keen attention to detail when reviewing my reports. Their unparalleled efficiency and accuracy makes them an invaluable asset.

SOREN GEMS

Gems & Partners

Amazing, they were the only contractor to call and seek clarification on the work scope, they has worked methodically thought the entire project providing all aspects on plans required, and is happy to make alterations very quickly, we highly recommend him for future projects

SHAUN SURSOK

Surewest Group

Let's Build Something
Remarkable Together.

Whether a private home or a city block — bring us your vision. We'll shape it into something that lasts.

Contact us now